Jargon Bustercovering ERP (enterprise resource planning), MRPII (manufacturing resource planning), Lean Manufacturing, JIT (just in time), TQ (total quality) etc. |
||||||
Any group of people will define and develop shorthand ways of talking about things that they are familiar with. This jargon can be confusing to others at best and positively off-putting at worst. I will attempt to de-mystify this jargon from the world of business planning and control, ERP, MRP, JIT, TQ etc. Please feel free to attach this jargon buster to your web site or intranet provided you leave the acknowledgement box at the end unaltered. If you would like to be advised of updates, please use the contact us form.
Having had my jargon buster in the public domain now for five years, my view is that if a term or abbreviation to do with MRP, ERP, JIT or TQ is not in this jargon buster you should tell whoever is using the jargon to stop confusing people and stick to words and acronyms that people understand. There will, of course, be new acronyms from time to time but they have to add something to the industry. This may sound arrogant but someone has to say it!
If you do not find what you are looking for and/or you think a term should be included in this jargon buster, please visit my ask a question page.
The definitions are necessarily limited to memory joggers and are based
on best practice techniques as taught by established professionals in the industry
such as BPIC and MRP Ltd.
If you would like to know more, click here for
more information about the book "Business Excellence", price £24.90 (about 45
US$ or
€37) that describes current
best practice in manufacturing planning and control techniques .
This year's edition of Business Excellence is now available in e-book format in addition to the paperback .
The best education courses to explain best practices in business planning and control,
including MRPII, ERP, JIT and TQ,
we call this "Business Excellence", is the
Business Excellence Fundamentals course.
There are 1, 2 and 4 day versions of this course.
Quick finder - click the letter or use <edit> <find> in Internet Explorer
A B C
D E F
G I J
K
L M
N
O P
Q R
S
T U
V
W
Y
Z
(use [Home] key to return to this index at any time)
A |
Jargon buster at www.bpic.co.uk |
ABC Code - Classification of parts by value. "A" class parts are the highest value and "C" parts the lowest. Typically "A" class parts contain 80% of the total stock value (e.g. annual demand or use multiplied by cost) but represent only 20% of the quantity. "A" class plus "B" class parts typically amount to 95% of the Stock value. "C" class parts are the remaining parts.
ABCD Checklist - A way to benchmark a company's planning and control processes using MRP LTD's 20 point checklist. A self assessment checklist is available at www.bpic.co.uk/abcd.htm, we also provide an independent, personal ABCD review service. If a company scores 18 out of the 20 points it is awarded Class "A" status.
Abnormal Demand Filter - A program feature that automatically detects customer orders that are abnormally large. Abnormal Demand Filters are used to avoid abnormal orders unwittingly consuming the forecast for "normal", forecast orders (see also Demand management).
Action Date - Day the next action on a part has to take place.
Activity Based Costing (ABC) - The allocation of indirect costs against the activities that caused them, an accounting technique that can more accurately reflect, indirect cost improvement than traditional standard costing.
Advanced Planning and Scheduling (APS) - to qualify as an advanced planning and scheduling system, the software must be a full function ERP or MRP II package and also include finite capacity scheduling and the ability to simulate the effect of changes of schedules by listing the exception messages that the change would produce at every level in the bill of material. Often present in APS is the ability to automatically select alternative material or sources to optimise plans and the ability to optimise where there are multiple constraints, e.g. optimise labour and equipment. Some finite scheduling packages are claiming APS but they do not have full MRPII functionality in which case they must fully integrate with an MRPII package.
Aggregate Inventory Management - see family
Allocation - The process of reserving on hand Stock for customer orders or future Works Orders that have been Released but not yet had their material removed from Stock.
Anticipated Delay Report - Formal notification of a delay to the due date of a Work Order or Purchase Order.
Auction - see reverse auction
Available to promise (ATP) - Stock or planned Stock not committed to a firm customer order. ATP is shown on the Master Schedule and is used to make delivery promises to customers. It is calculated by subtracting from each point of supply (master schedule receipt) actual customer's orders up to the next point of supply. The Quantity on Hand is added to or taken as a point of supply for the first time period. Negative quantities are carried back to earlier weeks. MRP Ltd. does not recommend accumulating available to promise.
Available Hours - The multiplication of the shift hours, machine
(or operator) hours and working days for a Work Centre.
Available Stock - see stock
B |
Jargon buster at www.bpic.co.uk |
Backup - A copy of the computer files kept in a safe place, usually away from the computer, for use in the event of the main files being lost or destroyed.
Back Scheduling - Some programs have an option to base the scheduling of orders on the Dynamic Lead Time rather than the fixed Lead Time in the Item Master File (see Window Scheduling). Back Scheduling is also used to refer to the calculation of the individual operation start dates based on the operation times shown in the Routing.
Balanced Scorecard - Performance measure which balances the internal (company) and external (customer) against finances, innovation and learning.
Batch Size - see Order Quantity.
Bench mark - Comparison of a one or more aspect of a Company's performance against the best in its own or other relevant industry sector.
Bill of Material (BOM) - The list of the components necessary to make a part or product and the amount of each component required. In some industries this may be referred to as a recipe or formula.
Bill of Resources - A list of some or all of the Critical Resources necessary to make an End Item. This is usually applied to the Master Schedule quantities for Rough Cut Capacity Planning.
Big Bang - An implementation strategy that cuts over all parts of a planning system at the same time in a company or division, as opposed to a phased implementation module by module. We strongly recommend a big bang (we call it a cut-over) due to the interdependence of all modules. It would be possible, for instance, to draw up a bill of material that is adequate only for either finance, planning, manufacturing or design but not for them all. The challenge is to implement an enterprise wide system that everyone can use from the start.
Blow Through - When a Phantom or Pseudo is found in the preparation of a kit picking list the parts needed to make the Phantom or Pseudo (less any Phantom parts found in Stock) are "blown through" to the kit.
Bottom-Up Re-Planning (BURPing) - The process of fixing a material or capacity problem at the lowest possible level by working back up the Bill of Material to the source of the demands.
BPIC - The Business Performance Improvement Consultancy - the best advice to help you improve your business performance through the better planning and control of your manufacturing processes!
Brand Name Kanban - Kanban authority to move or produce a specific part number (see Generic Kanban).
Bucket - A time period (e.g. a day or a week) in which all demands or requirements are added together and treated as one
Bucketless - All demands for a part keep their individual date identity and so can be traced back to their original source of demand through a Pegging Report, essential for bottom up re-planning.
Buffer Stock - see Safety Stock
Bulk Issue Business Excellence (BE)
Business Plan - The strategic top level plan or budget expressed in financial terms looking forward at least one year, often five years or more. The first year is frequently used for the monthly budget. The business plan should be implemented using Sales and Operations Planning.
Business Process Re-engineering (BPR) - Just in
Time techniques applied to administration areas with particular emphasis
on laying out the work flow by process and breaking down the traditional
functional barriers between sales, planning, manufacturing and accounts.
When Business Process Re-engineering is combined with manufacturing Just
in Time ideas the result is a Focused Factory.
C |
Jargon buster at www.bpic.co.uk |
Capacity Requirements Planning (CRP) - The process which determines the amount of labour and/or equipment Resource required each day or week to meet the planned level of business at each Work Centre. The amount of Resource is defined in the Routings.
Cell Manufacture - see Group Technology.
Class "A" - Award given to a Company that has been assessed as achieving eighteen out of twenty Business Excellence criteria defined by MRP Ltd on their ABCD Checklist.
Collaborative Planning, Forecasting and Replenishment (CPFR) - Companies in a supply chain getting together to forecast and plan requirements. Don't ask me why such an acronym is needed!
Component - Part needed to make a Parent item as shown on its Bill of Material.
Computer Aided Design (CAD) - Use of a computer to aid in the design and/or production of drawings of parts.
Computer Integrated Manufacturing (CIM) - The use of computers for manufacturing planning and/or computer aided design. The CIM acronym has also been used for "computers in manufacturing" and "continuous improvement methods".
Configurator - A software tool to simplify order entry when a product may be sold with a number of features and options. When used with Planning Bills of Material and two level Master Scheduling, configurators can significantly improve customer service levels.
Consignment Stock - Stock only paid for when it is used. Consignment stock should change nothing except cash flow. Holding any more stock than is necessary is always inefficient whether it is consignment stock or not.
Control Group Cycle Counting - A sample of Parts, usually 100, counted every week usually 20 parts per day, to detect problems with the Stock recording process.
Consumable Stock - Stock that is consumed in the manufacture of the product but is held in a form that makes it impractical to issue directly to a job such as bulk liquids, powder or gasses, reels of solder, welding rods, salt, cottons etc. (see also Bulk Issue).
Continuous Improvement - (see Just in Time).
Critical Resource - Anything which could limit the Company's ability to accept an order from a customer is a Critical Resource. Frequently this is Final Assembly labour or equipment but could include the capacity of earlier processes or even a Vendor's capabilities.
Cumulative Lead Time - The total time required to make a part assuming there is no Stock of any of its Components including the time to purchased any components required.
Customer Relationship Management (CRM) - In
additional to all the usual customer care principles, CRM includes the
storing of customer information in a database (or data warehouse) and using
the information in a way that improves the customer's "experience".
Ideally this information is integrated into operational processes. More
details
Cycle Count
D |
Jargon buster at www.bpic.co.uk |
Dekit - Return of parts issued on a Works Orders back to Stock when a work order has been cancelled.
Demand Management - A process for managing customer demand by forecasting requirements and either making delivery promises based on the quantity of product available to promise and consuming the forecast for forecasted orders or recognising the demand is abnormal (i.e. not forecast). Abnormal demand has to be referred to the planner who will do the best he or she can to cover the demand without jeopardising forecast orders.
Demonstrated Capacity - The output consistently achieved from a fully loaded Work Centre working normal hours, often, but not necessarily, measured in Standard Hours. Demonstrated capacity must be based on output history for a work centre(see Input Output Control).
Dependant Demand - Demand passed down by the MRP process from the parent(s) of the part to a lower level Master Schedule item in the Bill of Material (see also Projected Gross Requirements).
Dependant Forecast - A sales forecast passed down from the Parent of a part when using configurators and Planning Bills of Material. The Dependant Forecast is the Available to Promise of the Parent multiplied by the popularity of that option set up in the Planning Bill of Material.
Design for Manufacturability (DFM or DFMA) - The systematic evaluation of a new product design that minimises critical manufacturing operations. Positive feedback of manufacturing problems is an essential element of Design for Manufacture.
Distribution Resource Planning (DRP) - Planning of Stock at distribution centres by a central location based on the forecast requirements of the individual centres exploded by MRP logic down to the centre.
Due Date - The date held on the computer for when an open Purchase Order or Works Order is due into Stock.
Dynamic Lead Time - The lead time for a part
calculated by the computer based on the operation times in the routing.
E |
Jargon buster at www.bpic.co.uk |
Efficient consumer response (ECR) - Improving product introduction, promotion, replenishment and storage of goods throughout the supply chain to increase customer service. Mainly applied to fast moving consumer goods.
Electronic Data Interchange (EDI) - The electronic transfer of data from computer to computer, normally via the national telephone system, using a common interchange convention for purchase order number etc..
Emergency Time Fence - see Time Fence.
End Item - A finished product that can be sold to a customer.
Engineer to order (ETO) - The design and manufacture of a product to a specific, usually unique customer design. This differs from Manufacture or Assemble to Order where mostly standard items are select from a catalogue. It is very common to use a configurator for assembling to order but less common and more demanding to use a configurator for engineer to order products.
Enterprise Resource Planning (ERP) - A computer planning system that uses the Manufacturing Resource Planning (MRPII) principles but in addition should have product configuration facilities, quality assurance management plus resource planning for the non-manufacturing areas such as plant maintenance, human resource planning etc.. Some people define ERPII as ERP using internet technology; so browser based, platform independent and with optional links to suppliers and customers.
European Framework for Quality Management (EFQM) - A Brussles based "not for profit" organisation to help European businesses make better products and deliver better service. The organisation works along the lines of the USA Baldridge model and the Japanese Deming award promoting total quality principles.
Exception Message - Message from MRP to highlight the need to take action such as release an order or to draw the planners attention to a problem with Stock level or Due Dates on Firm Planned or Released Works Orders.
Excess Stock - Stock which exceeds all actual plus forecast demand.
Expedite - To manually check the status of a Released Purchase Order or Works Order usually to try to influence priorities. The necessity for expediting indicate the need to improve the planning process.
Explosion - Computer calculation of the requirement for the Components of a part based on its Bill of Material.
External Set-up Time - Time needed to change
a tool or fixture from one job to another that can be carried out whilst
the machine is still in production (see Internal Set-up
Time).
F |
Jargon buster at www.bpic.co.uk |
Family - The highest level aggregation of End Items where all End Items within the Family require similar Critical Resources, can be forecast and make a similar contribution to profit. Dividing the product range into no more than 20 families is an essential part of Sales and Operations Planning. If no division of the product can satisfy all three of the above criterion, sub families may be used to forecast, check critical resources or monetarise the plan.
Fences - see Time Fences.
Field - A piece of information held in the computer or a space
on an input screen.
Fill Rate
Filter - A way for the computer to check for unusual or particular entries. Filters can be used to check what is entered in a particular Field (e.g. ensure that only numeric values or dates are entered), to print reports if pre-set conditions have been met (e.g. to highlight Abnormal Demand, print Exception messages only in particular cases etc.). Any filtering of Exception Messages is a bad practice. The causes of the exception messages should be fixed not the symptoms.
Finite Capacity Planning - Computer controlled re-scheduling of Works Orders based on pre-set capacity Resource levels and fixed scheduling rules. Any automated, computer based re-scheduling is a bad practice as customer service could suffer (see infinite capacity planning).
Finite Capacity Scheduling - Computer assisted way to schedule work in a defined sequence. Finite Capacity Scheduling is often used to group similar materials, schedule colours from light to dark etc. to minimise change-over times. Instead of holding only one set-up time for a job, the software holds a table of set-up times between jobs. This technique is only of value to companies where the sequence jobs are run in is important and subject to rapid change. The alternative is good master scheduling.
Firm Planned Order (FPO) - An order which is treated as a planned order for the MRP calculation but one that will not be changed, either in date or quantity, by the computer. Firm Planned Orders are raised manually and used for Master Production Scheduling and to override the computer settings of Order Quantity, Lead Times and Safety Stock, usually to overcome material or capacity problems.
Firm Time Fence - see Time Fence.
First-in, First-out (FIFO) - Stock rotation that issues the material which has been in stock the longest. Stock should be valued o the same basis.
First Pick Ratio - see fill.
Fixed Order Quantity - see Order Quantity
Flexibility - A measure of the ability of a Company to respond to changes in demand. Direct labour Flexibility is the number of direct operators multiplied by the number of Families of products each is trained to work on divided by the number of direct operators multiplied by the number of Families. The Flexibility of an indirect department is measured in the same way except substituting the jobs in the department for the Families in the above calculation. Increasing Flexibility is the key to increasing customer responsiveness.
Focused Factory - Manufacturing carried out in self contained production process focused groups, usually including some administrative functions such as order entry. A Focused Factories is sometimes called a "factory within a factory"
Forecast - see Sales Forecast.
Fourth Party Logistics (4PL) - A supply chain integrator that assembles and manages the resources, capabilities and technology of multiple logistic services providers (e.g. transport and delivery of goods) including, in most cases, its own (see also Third Party Logistics).
Free Stock - Stock on hand not allocated to a future Shop or
Customer Order.
G |
Jargon buster at www.bpic.co.uk |
Generic Kanban - Kanban authorisation to move or produce, where what to start or move is determined by some other method such as a Work to List (see Brand Name Kanban).
Global - Values (or Parameters) that apply to the whole system.
Goal - statement of intent for the direction of the business.
Goods Received Note (GRN) - A document produced when goods are received into the factory. It will usually accompany goods to any inspection and is used to check against invoices before payment.
Gross Requirements - The summation of all Dependant (MRP generated) and Independent (customer generated) requirements.
Group Technology (GT) - A cell or group of people
with a high level of cross training so that they are able to produce a
complete product or assembly. The cell is considered as one Work Centre
for Capacity Planning purposes.
GUS classification - A classification of products where "G" (general) parts are used on several products and purchased in bulk or against a schedule, "U" (Unique) parts are likely to be used once only. "S" (Specific) parts are purchased against specific higher level demand.
I |
Jargon buster at www.bpic.co.uk |
Infinite Capacity Planning - Material and capacity planning which is not constrained by any theoretical capacity restraints. Action to overcome any over-capacity situations is under the manual control of the planner using Bottom Up Re-Planning.
Input Output Control - A scheduling and capacity monitoring technique where the required load (input) is compared with the historical production (output) using the same basis for comparison, the essential feedback of Demonstrated Capacity.
Internal Set-up Time - The average time lost changing equipment from the last component of the previous Works to the first good part of the next Works Order. Time spent on change over that can be carried out when the equipment is in production is called External Set-up Time
Inventory - see Stock.
Inventory Turns - see Stock Turns
Issue List - see Kit list.
Item Master File - The computer's record of all fixed information
about a part number. It must include the Lead Time, Order Quantity and
Safety Stock as well as the part’s description, cost, type of part and
sorting codes. The file may have a different name such as Material
Master File in different systems.
J |
Jargon buster at www.bpic.co.uk |
K |
Jargon buster at www.bpic.co.uk |
Kanban - Authority to move or produce a Part based on its usage. The authority is typically in the form of an allocated space on the floor, bench or rack, an empty container or a card (Kanban is a Japanese word meaning Signpost).
Kitting - The act of extracting (or "Picking")
parts from Stock that are required to produce a Released Works Order.
Kit Picking List - Computer generated list
or kit of the parts needed for a Works Order. Parts will have been allocated to
the Works Order by the act of Releasing the order.
L |
Jargon buster at www.bpic.co.uk |
Lead Time Offset - The logic of Material Requirements Planning
assumes that all the components of a part are required at the release date
for any Planned or Firm Planned Orders of the Parent. The need date for
a component may be delayed by adding a Lead Time Offset to the component
part in its Bill of Material. This is useful where parts are bulky, expensive
or delicate but does mean that, when the Lead Time of the Parent is changed,
the Lead Time Offset must be checked. A Lead Time Offset also means that
when a Works Order is released it will not be possible to check the availability
of any parts with a Lead Time Offset. Lead Time Offset may also be used
to offset capacity requirements for Rough Cut Capacity Planning.
Lean Manufacturing
Leeway - Some systems will not re-schedule Planned Orders when the difference between the Need Date and the Due Date is less than the Leeway (not recommended).
Level Codes - Each level in a Bill of Material is given a level code usually starting from level 0 as the top level End Item. Thus a single level Bill of Material consists of a Parent and purchased Components only. The setting of these Level Codes by the computer prior to each MRP run is referred to as "levelling".
Load Factor - The conversion of the Available Hours at a Work Centre into the Work Centre's capacity. It is calculated by dividing the Demonstrated Capacity by Available Hours.
Location - the location reference for Stock in multiple Stock location systems.
Logical Device Number - The "address" used by the computer to identify a piece of equipment (e.g. printer, terminal etc.).
Lot size - see Order Quantity.
Lot for Lot - An Order Policy that tells the
computer to plan the exact quantity needed in each time period.
M |
Jargon buster at www.bpic.co.uk |
Manufacturing Resource Planning (MRP II) - The integrated planning of a company's material, equipment and people to meet the Business Plan. The integration requires that the same information (Sales Forecast, Bill of Material, stock records, actual works, purchase and customer orders etc.) is used throughout the Company. These days it is usual to use an MRPII or ERP computer system to achieve this integration.
Mask - The automatic formatting of an entry into a Field.
Master Production Scheduling (MPS) - The planning
of production (usually End Item Production) to satisfy current and forecast
orders. The sum of all Family MPS items must equal
the agreed Sales and Operations Plan for that Family
over each planning period (normally a month or 4 week period). The MPS
report includes an Available to Promise figure to enable
realistic, achievable delivery promises to be made to customers. Items
planned at the MPS level are exploded by MRP to produce the detail material
and capacity requirements. Orders should be Firm Planned
Orders at least as far as the Cumulative Lead Time.
Material Requirements Plan (MRP) - The time phased Explosion of the material requirements based on the Bill of Materials, Lead Times, Order Quantities and Safety Stocks to determine what to make or buy and when. MRP should be driven by the Master Production Schedule. The same calculation drives the Capacity Requirements Plan. MRP used to be referred to merely as production control.
Maximum Capacity - The maximum capacity that can be loaded onto a Work Centre based on one or more agreed courses of action (e.g. overtime, additional shifts etc.).
Milestones - Achievable short term Targets at which it is possible to evaluate progress towards a final Objective.
Mouse - Hand control device to position the cursor or pointer on the computer screen.
Multiple - see Order Quantity.
N |
Jargon buster at www.bpic.co.uk |
Nettable Location - Any location where the parts can be counted as part of the available Stock for MRP calculations. (Non-Nettable locations are ignored in MRP calculations).
Nominal Group Technique - A particular form of brainstorming that aids team participation. Stages in the technique include problem clarification, silent idea generation, round robin idea collection, grouping and ranking.
Number of Days Supply - Used to determine the
number of days of future requirements used in the Period
Order Quantity calculation.
O |
Jargon buster at www.bpic.co.uk |
On Hand - See Stock.
On Time In Full (OTIF) - The right quantity and the right quality delivered to the customer on the agreed order delivery date. If there are multiple lines or items on an order, one hit means all ordered item lines are delivered on time in full. If one line item is missed, this is a miss for the whole order. The agreed order delivery date can include a reasonable amount of agreed re-scheduling.
Operation Number - A sequential reference number given to each process step on a Routing.
Optimised Production Technique(OPT) - the management and planning
of manufacturing based principally on the capacity of the bottlenecks,
useful when there is a single bottleneck that does not change.
Order Point - see Re-order Point Order Policy
Order Quantity - The batch quantity of a part that the computer will plan to be made at one time whenever the projected available balance for that part falls below zero or the safety stock if there is one. If more than the Order Quantity is required the computer will plan in Multiples of the Order Quantity.
Over-planning - A technique to maintain Lead Time for a wider variation of features and option when using Planning Bill of Materials. The Master Schedule is deliberately overstated for the option parts between the Emergency time fence and the Planning Time Fence by up to the amount of the unconsumed Sales Forecast.
Overall equipment effectiveness (OEE)- OEE is a formula to give the overall performance of a single piece of equipment, or even an entire factory, governed by the cumulative impact of 3 factors, the equipment's availability (percent of scheduled production time available), performance rate (percent of parts produced compared to standard) and quality (percent of sellable parts produced compared to parts started). As the formula is complicated and often not properly understood by the people it is directed at, it is usually better to use the simple, easily understood elements of OEE as performance measures, namely downtime%, yield% and, the most important, output/demonstrated capacity%.
P |
Jargon buster at www.bpic.co.uk |
Parent - A manufactured part with Components shown on its Bill of Material.
Pareto Principle- the use of the fact that in many cases the majority (typically 80%)of results are due to a minority (typically 20%)of contributors. For example 80% of orders come from 20% of customers, 20% of parts have 80% of the value.
Part Number - Unique identifier for each and every part with the same form, fit and function. Current best practice, when using a software planning system, is a non-significant, all numeric part number (for more information see FAQ answer?
Past Due - Orders with a due date earlier than today. All Past Due orders must be re-scheduled as they result in wrong information on related and dependant parts.
Pegging - The name given to the facility to trace a demand for a part back to the source of that demand (Works Orders, Sales Forecast etc.). Also referred to as Drill Down.
Period Order Quantity - The determining of the Order Quantity based on the requirements for the Part over a pre-determined Number of Days Supply ahead, starting with bringing the first or current period to zero, or the Safety Stock if there is one.
Perpetual inventory Control- Inventory is updated and cycle counted at least daily.
Phantom - A sub-assembly not planned to be held in stock. A Phantom will appear on a Bill of Material but the Kit Picking List will show the Parts needed to make the Phantom (less any Phantom Parts that may be in Stock) rather than the Phantom itself. The software will not expect or need Works Orders to be raised for Phantom Parts. Phantoms are also called non-returnable assemblies and blow-throughs.
Picking - see Kitting.
Plan-Do-Check-Act (PDCA) - Scientific problem solving technique pioneered by Dr. Edward W. Deming, the Total Quality consultant.
Planned Capacity - The load planned for a Work Centre. The Planned Capacity should be the same as the Demonstrated Capacity unless there is an approved plan of action in place (e.g. change in the working hours, transfer of labour etc.). Planned Capacity is the input for Input Output Control.
Planned Order - A Work Order or Purchase Order suggested by the computer to restore the projected available balance to zero or the safety stock level if there is one. Planned orders for manufactured parts are offset by the lead time and passed down to the projected gross requirements of all its component parts shown on the bill of material.
Planning Bill of Material - An artificial (Pseudo) Bill of Material used, for instance, to forecast the options of a Family of products. The Planning Bill generally shows the common parts (as a Pseudo part) and the forecasted mix of the available options, the forecasted percentage popularity of each option being shown as a ratio on the planning bill of material. For example, an option that is forecasted to be specified 35% of the time is shown as having a quantity per of 0.35 on the planning bill of material.
Planning Time Fence - see Time Fence.
Poka-Yoke - The design of equipment that will reduce or, if possible, eliminate the chance of mistakes (a Japanese word meaning fool proofing).
Process Control Cycle Counting - Cycle counting by location only those Parts that are easy to count or obviously incorrect.
Production Control - see MRP
Projected Available Balance - The future calculated Stock left after adding expected receipts (Planned, Firm Planned and Released Purchase and Works Orders) and subtracting forecast and actual requirements (Dependant and Independent).
Projected Gross Requirements - The future, expected demand for a part that originates from a higher level in the Bill of Material. Used in Material Requirements Planning.
Pseudo - A part number whose Bill of Material is a convenient collection of parts which can be used to simplify drawing or forecasting (see Planning Bills of Material). A Pseudo cannot be made on its own or held in stock. It is treated in the same way as a Phantom by the planing software. Different software packages give different names to this item such as sales bill, configured bill etc...
Pull Scheduling - Production scheduling based on the use or sale of the part. Usually used to describe a Kanban system.
Purchase Order - Request for the supply of a specific part from a vendor including a Due Date and quantity.
Push Scheduling - Production scheduled to meet forecasted and/or
planned use or sale of a part. Usually used to describe “traditional” MRP
scheduling.
Q |
Jargon buster at www.bpic.co.uk |
Quantity on Hand - Total of all Nettable Stock for a part.
Quality Function Deployment (QFD) - Product design and development technique that compares the fit between Customer needs and product features.
Quarantine Stock - Stock shown as on hand but not available for use, frequently awaiting or failed inspection. Quaranteen stock must be reviewed daily to avoid unexpected shortages.
Queue - Work-in-progress not being worked on.
Queue Compression - When the sum of the time required calculated
from a routing (Dynamic Lead Time) is not the same as the Lead Time on
the Item Master file, the planning software should compress the queues
to make the lead time the same for planning and tracking if Window Scheduling
is being used.
R |
Jargon buster at www.bpic.co.uk |
Radio Frequency Identification (RFID) - Very wide application from tracking migrating birds to retail purchases. In the supply chain RFID generally refers to the attachment of tags to stock to automatically locate stock and record movement past sensor points.
Release - The act of Releasing an order converts
the order from a Planned or Firm Planned Order into a Scheduled Receipt.
When a Planned Order is Released the parts required are Allocated against
the order prior to Kitting.
Re-order Point (ROP)
Required Capacity - The computer calculated Resources required at a Work Centre for a given time period based on the Routing. The Unit of Measure, often Standard Hours, is defined in the Routing.
Residual Forecast - see sales forecast
Resource - The Company’s available equipment or labour usually, but not always, measured in Standard Hours. For equipment the Resource hours available must include the time needed both to Set Up and Run the equipment.
Resources in Progress (RIP) - The combination of Work in Progress
and Stock for a part. RIP can be used when a part is Backflushed
and/or
some part of the stock is held at the point of use.
Reverse Auction - In a normal auction there is a single seller and many potential buyers bidding for the item being sold. A reverse auction, used for e-purchasing and generally using the internet (an e-auction), involves one
buyer and many sellers. The general idea is that the buyer specifies what
they wants to purchase and offers it to many suppliers. To make sure the
winner is suitable the buyer should pre-qualify those suppliers who are allowed to take
part. The process will usually produce the lowest possible price but
suppliers should be chosen on the basis of quality, cost, dfelivery performance, development resources, management and finances not just price. Reverse auctions are therefore not recommended for Business Excellence companies who require a small number of vendors reliably delivering quality product to the point of use. Reverse Logistics - The logistics associated with the management
of waste or used products. Reverse Logistics has become more important
recently as governments have introduced legislation to reduce the dumping
of waste so that companies have set up to re-use, re-cycle, repair, refurbish
and/or re-manufacture what would previously have been dumped. Most
of standard MRP II logic applies to reverse logistics although there is
more emphasis on quality and variability issues.
Revision Level - The issue date or letter of engineering drawings.
Rough Cut Capacity Planning (RCCP) - The summation
of the Critical Resources needed either for a Family
in
the Sales and Operations Plan or an End Item in the Master Schedule. The
Required Capacity should be compared with the Demonstrated Capacity to
validate the plan.
Routable -see Phantom.
Routing by Walking About (RBWA) - A method of flow charting a
process by walking the course taken to ensure what is charted is what actually
happens.
Routing - A sequenced list of the operations
needed to manufacture a part. A Routing should include the amount of Resource
required at each Work Centre the part passes through. Tooling should also
be included in a part’s Routing. Routing information must be held on the
planning system for every manufactured part and used for capacity planning
and costing.
Run Time - The Standard Hours needed to produce
one item at an operation in the Order Quantity held on the part's Item
Master File.
Runners - The term used for products produced most frequently.
Safety Stock - The level of stock that the computer
will plan as a minimum. Safety Stock is used to be able to offer shorter
Lead Times to customers than the Cumulative Lead Time or to provide continuity
of supply where there are uncertainties in requirements. The uncertainties
could be due to unreliable machines, fluctuating yields, absence etc..
Sales and Operations Planning (SOP) - An agreed
summary of the production level required for a product Family
to
meet the Sales Forecast with the known Critical Resources.
It is normally shown by month with three months of history and a forward
projection beyond the longest period required to increase the Critical
Resources. The level of production agreed is the authority for the level
of production in the Master Production Schedule.
Sales Forecast - The best estimate by Sales
and/or Marketing of future requirements used as the input to the Sales
and Operations plan at the Family level and/or as input to the Master Production
Schedule at the Item level. All forecast orders received should be subtracted
from the forecast to leave a residual forecast in the master schedule so that total demand is
always calculated as orders plus residual forecast for each time period. Consuming the forecast
in this way is an essential element of Demand Management.
Scheduled Receipt - An open Purchase Order or a Released Works
Order for a part with a due date and quantity..
Scrap - The unexpected loss of a completed
part for any reason. In a true Total Quality environment there should not
be an allowance for Scrap in the computer Explosion of requirements as
such an allowance "turns off the warning bells". If scrap is allowed for,
some systems hold the information in he Item Master File, some in the Bill
of material. The Projected Gross Requirements should be inflated by the
Scrap allowance. If there are Yield losses or Shrinkage due to the nature
of the manufacturing process, these losses should be allowed for in the
Explosion (see Yield).
Service Orientated Architecture (SOA) - a software design that integrates business functions. Users are able to decide the information which is to be shared between the functions. SOA is therefore more flexible and more loosely coupled than ERP and generally more suitable for service rather than manufacturing companies. Set-up Time - See Internal Set-up Time
Shop Order - see Works Order
Shortage - A part not available for a Released Works Order. Jobs
should not be Released with shortages without the approval of the appropriate
operational manager.
Shrinkage Factor - the percentage of a Part
lost as a result of the process. A Shrinkage Factor is generally applied
to all usage of a Part and so is entered into the Item Master File. Yield,
on the other hand, is generally applied to one use of a Part and so is
entered on the Bill of Material.
Silver Bullet - A 'one time' Kanban card
or token that authorises a part to be made but which is not returned from
the user back to the maker. Silver Bullets are used to inject a temporary
increase in production ahead of a shut down or a short term drop in requirements.
Silver Bullets may also be used to 'plug a gap' whilst a problem is being
investigated.
Six Sigma - Originally a measurement of process quality coined by Bill Smith of Motorola in 1986 . Sigma is the mathematical symbol for standard deviation. As an example, about 93% of all results from a normal population (i.e. results are equally distributed above and below the mean) fall within 3 standard deviations, within six standard deviations (six sigma) would give no more than 3.4 failures in 1 million units of production. In 1991 the first Black Belt was awarded to successful practitioners. Around 2002 six sigma moved from being a metric to a methodology. The use of six sigma principles in a manufacturing situation means that the company uses all the
total quality tools to improve a process so that the tolerances for the process is at or better than six standard deviations of the process spread. Standard Hours - The most usual unit of measure
for Capacity Planning. Standard Hours can be converted into 'Clock Hours'
using the Load Factor calculation.
Statistical Process Control (SPC) - The continuous monitoring
and charting of a process while it is operating, to warn when the process
is moving away from predetermined limits. Typically the upper and
lower control limits will be three standard deviations away from the mean.
All points outside the control limits should be investigated and corrected.
Stock - Part not being worked on, held at one
or more specified locations. Stock is increased by receipts or returns
and reduced by issues or Scrap transactions. Every stock item must have
a unique Part Number.
Stock Keeping Unit (SKU) - see End Item.
Stock Turns - The rate of consumption of stock, measured by the
number of days of forward stock cover divided into the number of working
days in the year. The most usual calculation is the value of raw material,
work in progress, intermediate product and finished goods divided by the
material value of the next year's sales forecast. A prerequisite is therefore
accurate stock and work in progress data (98%), accurate bills of material
(98%) and an agreed sales forecast used for manufacturing planning.
Strangers - The term used to describe parts or End Items that
are not produced on a regular basis.
Structure - The name given to the way the Bills of Materials
are drawn up. The Bill of Material Structure includes the number of Bill
of Material Levels and the use of Pseudos
and Phantoms.
Supply Chain Management (SCM) - The control of the supply of
Parts from vendor through to customer. There is no fundamental difference
in principle between Supply Chain Management and Manufacturing Resource
Planning. SCM is also used to refer to short cycle manufacturing, which
is the manufacturing elements of Just in Time.
Supervision Control and Data Acquisition (SCADA) - Software and/or
equipment that collects information from a production unit either by monitoring
devices on equipment or by manual input via bar codes and keyboards. Also
known as shop floor data collection. Supply-Chain Operations Reference-model (SCOR) - yet another supply chain
best practice model which considers the supply chain as 4 levels. Level 1 is plan, source, make and deliver.
Level 2 defines the core processes. Level 3 is the information. Level 4 is implementation.
Target - A measurable event at a point in time
that contributes to the achievement of an Objective.
Theory of Constraints (TOC) - Eli Goldratt’s extension of his
simple Optimised Management Theory where you manage just the bottleneck
(described in his novel called “The Goal” - see book
review page for more details), to the management of all manufacturing
constraints.
Third Party Logistics Providers (3PL) - Companies that provide logistics services such as transport and delivery of goods (see also Fourth Party Logistics) Throughput Ratio - A key performance measure for a Company based
on the ratio of Added Value (Sales less material costs) divided by the
sum of Operating Expense and the cost of holding stock.
Time Fence - A point in time where the planning
rules change. An example is the Emergency Time Fence after which orders
should only be changed in an emergency. In Master Production Scheduling,
the Planning or Firm Time Fence is the point before which the planning
system will not raise planned orders, so that the planner is in control.
Total Preventative Maintenance (TPM) - The maximisation of equipment
effectiveness by minimising unplanned stoppages. Maintenance is carried
out to a pre-planned schedule, rather than waiting for the equipment to
break down.
Total Quality (TQ) or Total Quality Management (TQM) - The culture
of an organisation where continuous improvement is integrated into all
activities with the objective of improving the quality of all Business
Processes. Total quality tools include process charts, pareto analysis, cause and effect diagrams,
histograms, run diagrams, check sheets and statistical process control.
Tracking - The process of monitoring the progress of Works Orders
through the operations shown on a Routing. A culture of Anticipated
Delay Reporting eliminates the need for time wasting tracking.
Transaction Log - The computer record of all MRP material movements.
The better Transaction Logs also show changes to the data base with the
name of the person who made the change.
Unit of Measure - The way Stock is measured throughout the MRP
system. A company should ideally only use 5 units of measure; each, a length
(e.g. meters), area (e.g. square meters), volume (e.g. litres) and weight
(e.g.kilograms). Additional Units of Measure (e.g. millimetres, centimetres
etc.) can lead to mistakes. It is important that a part’s usage on the
Bill of Material uses the same Unit of Measure as is used in the Stock
calculations. Some systems allow a different Unit of Measure for Purchase
Orders and convert the quantity into the standard Unit of Measure for the
MRP calculations but this can also lead to errors so is not recommended.
Variance - Difference between two figures, typically used to show
the difference between actual costs and budget or “standard” costs.
Velocity - A measure of material flow time, for instance the
longest time that elapses between a vendor being notified of a requirement
for a part (or when a requirement for a part on a Vendor Schedule passes
into the frozen portion of a vendor schedule) to the use of that part.
Velocity can also be used the show the time that elapses between a part
arriving at goods-in and leaving on a shipment to a customer.
Vendor Managed Inventory - Storage of material, generally held
at the point of use, replenished by the vendor either at agreed intervals
or monitored remotely. Vendor Managed Inventory is the ideal way to manage
the supply chain but it must be supported by a vendor schedule to maximise
supply chain efficiency.
Vendor Schedule - A formal agreement for a Vendor to supply parts
over a period of time. A Vendor Schedule would normally include a period
where the requirement is frozen, a period where some change is allowed
and a period that is just for the vendor's planning purposes. All direct
material should be on a vendor schedule, including material on Kanban and
Vendor Managed inventory, to improve the efficiency of the supply chain
and so the minimise costs for vendors and customers.
Window Scheduling - The calculation of Work
Order start and Due Dates based on the fixed Lead Time held in the Item
Master File. Window Scheduling is used rather than Back Scheduling,
which calculated the Dynamic Lead Time from the Routing
for each Works Order, when batches of work will flow around the production
area more or less in the same sequence so with approximately the same lead
time. Back scheduling will result in different Lead Times depending on
the quantity on the Works Order.
Work Centre - People or equipment (Resources)
which may be treated as one Resource for Capacity Planning purposes. The
capacity of the Work Centre should not normally be affected by the mix
of work.
Work in Progress (WIP) - Parts being or about to be worked on.
Work in Progress is increased by issues and decreased by the completion
of Works Orders, the return of parts to stock or scrapping parts.
Work to List - The list of Works Orders that are either at or
coming shortly to a Work Centre. The Work to List is used to decide the
priorities according to the operation due date. As a minimum, the list
shows the Part Number, the quantity required and the operation at that
Work Centre in priority date order.
Works Order - The authority to produce a part
using the components specified on the Bill of Material and the process
specified on the Routing. The progress of requirements in an MRP system
is as follows:
S
Jargon buster at www.bpic.co.uk
T
Jargon buster at www.bpic.co.uk
U
Jargon buster at www.bpic.co.uk
V
Jargon buster at www.bpic.co.uk
W
Jargon buster at www.bpic.co.uk
World Class - The recognition of an organisation
as a Benchmark by its industry sector and, for some aspects, by other industry
sectors. World Class organisations consistently deliver exceptional performance,
frequently in excess of expectations. The final essential characteristic
of a World Class organisation is that it is continuously improving its
performance.
Y
Jargon buster at www.bpic.co.uk
Z
Jargon buster at www.bpic.co.uk
Zero Inventory - (see Lean Manufacturing)
A more detailed description of most of the definitions above can be found in "Business Excellence" by Phil Robinson
Phil Robinson is a business consultant specialising in manufacturing planning and control.
Phil also teaches on public courses with MRP Ltd. and on BPIC in-house, private courses.
If you have any comments or suggestions please contact us or visit: http://www.bpic.co.uk
Author : Phil Robinson
Published by BPIC - the business performance improvement consultancy
24, Hove Park Villas, Hove BN3 6HG, England - tel : +44 (0)1273 708561
Url : http://www.bpic.co.uk
© Copyright 2006 Phil Robinson
First published by BPIC 1997 - ISBN 0 962 8885 05
All rights reserved. Reproduction for profit strictly forbidden. The material may be copied for personal and company internal use provided this resource paragraph is included.