Home

About us

FAQ / Questions? Books Education ERP Implementation Toolkit Search Site map Free checklists: WCM  ABCD
BPIC the Business Performance Improvement Consultancy Our tried and tested ERP Implementation Plan 10 case studies on the implementation of ERP and MRPII systems in the UK Jargon Buster covering ERP, MRPII, JIT, TQ etc. Useful links How to live with an ERP or MRPII system and why they don't always help Contact us

 FAQ : When is JIT appropriate and when MRP/ERP?

1) How to decide between MRP & JIT? - If a manager has a satisfactory MRP or MRPII system in place, he should look to JIT to simplify his processes as the first stage of implementation (see world class manufacturing courses). Once he has simplified his processes, it is much easier to implement a new planning system although it is possible that the current planning system may now be sufficient. If his current MRPII processes are poor, he should follow the full ERP/MRP implementation plan although some simplification should be carried out if possible e.g. reducing the number of levels in the bill of material.

2) JIT and MRP are quite different but complementary material planning and control concepts. MRP (material requirements planning), MRPII (manufacturing resource planning) and ERP* (enterprise resource planning) are time phased, forward looking material and resource planning tools. JIT (just in time) is a philosophy based on the elimination of waste, an important component of JIT is kanbans which is a technique based on replacing material that has been used but has no forward visibility. It is possible to operate satisfactorily with MRPII only but it is not possible to use JIT only to run a manufacturing operation as you cannot operate a manufacturing facility without forward planning, however simple, to ensure that capacity and any materials that cannot be replenished with kanbans are available when required.

In summary, MRP gets you in control whilst JIT helps you to improve your processes. For more information you should get a copy of my book. More details and how to order click here

*For the historical difference between MRP, MRPII and ERP see ERP survival guide.


Phil Robinson - www.bpic.co.uk
BPIC - your manufacturing planning resource