Best of breed (BOB) versus fully integrated system (FIS) which is best? by Phil Robinson |
|||
Introduction Fully Integrated Software (FIS) is a software package with a number of integrated modules to cover a range of functions and requirements. There are generally a number of databases automatically linked by key fields such as the part number or customer's name. In a manufacturing company the principle fully integrated software is Enterprise Resource Planning (ERP) or variations such as Advance Planning Systems (APS) which have similar core functionality plus some extras. There are some applications required by manufacturing companies that ERP packages cannot handle, such as Computer Aided Design (CAD). Some functions ERP packages do handle but not generally as well as the best of breed packages, such as sales forecasting and customer contact management. Some functions ERP packages handle well, such as master production scheduling, material requirements planning, capacity requirements planning, inventory control, engineering data control (the bill of material in particular), purchasing and finance. In addition some integrated manufacturing packages have additional features such as finite capacity scheduling, payroll, planned maintenance and so on. First we need to look at what functionality a manufacturing company typically requires from its software. Which software applications? Where there are question marks in the table, this indicates that some integrated manufacturing systems can do this task and some cannot or do not do it well so your choice depends on which package you are using or considering. Visual planning systems Spreadsheets As a company grows it outlives spreadsheets and there are benefits of fully integrated software. If a company has implemented a planning system but still has information on spreadsheets that could and should be on the integrated system, this is a symptom that the planning system was either not properly implemented or is not being used properly. The spreadsheets undermine the integrity of the planning system for everyone. To summarise so far, for small companies with, say, less than 50 people selective use of best of breed software is a clear winner. The main exception is where the company in question is a small part of a larger corporation with the need to exchange or combine data on a regular basis. It is with larger companies that the best of breed versus integrated software such as ERP is a more difficult decision. ERP versus Best of Breed
Time, cost and resources Implementing best of breed packages can be spread over a longer time period. Each package may only affect one department so can be implemented at a time when that department is available. On the other hand each best of breed package will have its own way of working. Anyone who has to work on more than one of the packages has to learn a number of completely different sets of instructions and whilst each may be simpler than the ERP equivalent, the total amount of learning will be considerably more. Each package will also come with its own set of constraints and problems where workarounds are required. When negotiating for an ERP package, the customer has the advantage that the purchase is large so there is a better chance of cutting a deal not just on the software but also on on-going support. With the best of breed packages the ticket price may be lower but there is little chance of negotiating. As a general rule best of breed software will give good value for money on the specific job it does but will not come with the bells and whistles that an ERP package can have with its larger source of data. In summary, if you can get the resources to implement an ERP package the overall cost and time required will generally be less than implementing the equivalent best of breed packages. Best of breed packages give you the option to spread the implementation over a longer time scale but will take more time overall and may actually cost more in the end. Degree of fit The more expensive ERP packages (often called tier 1) have countered this problem by building in a huge amount of flexibility. Flexibility however also brings complexity and complexity means lots of consultants spending lots of time configuring the product to your exact needs which in turn means extra cost and time. To counter the cost and time required to implement these highly flexible packages, the implementation consultants have produced pre-configured "templates" for specific applications such as a food industry template or a textile template, but these templates reduce the flexibility of the package. With an integrated package you cannot have both simplicity and a good fit. On the degree of fit question, best of breed packages win not just because they can be bought to meet an exact requirement but because they can usually be used "out of the box". Simplicity of use Some companies attempt to integrate best of breed packages but however much your IT guys say integration will cost you should multiply by 10! Occasionally integration can work particularly when the applications have been designed to talk to the other application. However, even if two applications can be made to transfer data reliably 100% of the time (99.9% is not good enough) problems arise if one of the applications is modified or upgraded when data can be lost with disastrous consequences. Simplicity of use is therefore a balance. Task by task best of breed generally scores but from an overall company perspective ERP is the winner in most cases. The bigger the company, the more the ERP packages scores over best of breed because of the volume of data, the need for speed and the sheer geography of larger companies. Project management Upgrades are a necessary evil. Complex ERP packages do not have a good upgrade history. No-one wants to be the first to upgrade unless there is a serious problem that the upgrade theoretically fixes. The trick is to wait a while, talk to the user group or watch the bulletin board until the dust settles on the new release and then upgrade. At least with one package you have one point of contact if things go wrong. With best of breed there will be a continual stream of upgrades. The more integration and data extraction that your IT department has done for you, the more work there will be at every upgrade. To summarise, best of breed wins on degree of fit but a fully integrated package wins on time, cost, resources, simplicity and project management. The best of breed approach does allow you to spread the cost and resources required for implementation so is a short term fix. Replacing a current ERP package The differences between ERP packages is not as much as their sales people want you to believe. The basic functionality is the same - add orders and material, subtract production and sales. Whilst the add-on are quite useful there is seldom a big enough difference to make it worth throwing away your current package and starting from scratch with a new one. The exceptions to this rule is if the software vendor has either gone out of business, has withdrawn support for the package or the package is so badly supported that it is unusable. I have been involved with companies in the process of replacing a system which a similar company is busy installing. I also know that the success or failure of the implementations has little to do with the software. If you are not currently using your ERP package successfully, you will need independent outside help to re-implement, just trying harder is never going to work. It is a fact that most successful ERP implementations had the help of independent outside consultants who had experience of successful implementations. Partial ERP implementations Another situation when a company does not need a full ERP implementation is when a package is either already implemented but not fully used or where only some of the modules have been implemented. In my experience for anyone but the smallest companies, the benefits of implementing the remaining modules is the most cost effective project the company is ever likely to have. There are 2 reasons for this. ERP packages when properly implemented are very cost effective. When a chunk of the cost and some of the implementation work has already been completed, finishing the job is much cheaper and quicker than starting from scratch and so has an even better payback. The differences between ERP packages, as mentioned above, is not enough to make it worth throwing away a partly implemented package and starting from scratch with a new one. The only exception to this rule is, as before, if the software vendor has either gone out of business or has withdrawn support for the package or it is so badly supported that it is unusable. Limited resources Summary
There are many applications such as CAD, customer contact management, sales forecasting and many human resource functions where best of breed is the best solution with managed manual interfaces to an ERP system. As ERP suppliers strive to extend their functionality so these peripheral applications may increasingly be effectively carried out within the integrated system. For larger companies that have an ERP system partially implemented or implemented badly, completing the implementation or re-implementing will be very cost effective.
Author : Phil Robinson Published by BPIC - the business performance improvement consultancy 24, Hove Park Villas, Hove BN3 6HG, England - tel : +44 (0)1273 708561 Url : http://www.bpic.co.uk © Copyright Phil Robinson All rights reserved. Reproduction for profit strictly forbidden. The material may be copied for personal and company internal use provided this resource paragraph is included. |
||